Home / Where we build / Île-des-Chênes

Custom homes in Île-des-Chênes, Manitoba

Île-des-Chênes, Manitoba is about 27 km from Portage and Main in Winnipeg, in the RM of Ritchot.

Backyard site work behind a dark-sided home, with wooden posts set in the ground, boulders, a skid steer and bare graded soil among trees

Île-des-Chênes, Manitoba

Building in Île-des-Chênes

Île-des-Chênes, Manitoba means “Island of the Oaks.” Source: Wikipedia, Île-des-Chênes, checked 10 October 2026. It is about 27 km by road from Portage and Main in Winnipeg. This page sets out what we found about building here: who issues the permit, how a lot is serviced and where the new lots are.

Permits

Permits through the RM of Ritchot

Île-des-Chênes is in the RM of Ritchot, and building permits come from its planning office on Main Street in St. Adolphe (204-883-2293). The application needs a surveyed site plan with a staking certificate and one stamped engineered plan.

Source: RM of Ritchot, building permits, checked 10 October 2026.

Ritchot works to Zoning By-Law 9-2019, charges $150 for a driveway permit, and adds inspections for water and sewer connections to the permit fee. Where a lot is on a well or septic field, those permits come through Manitoba Environment. Ritchot changed its fees on 18 December 2024, so check current rates. Erd confirms what your lot needs in your written quote.

See who issues the building permit in each town.

Servicing

Water and sewer

Île-des-Chênes has a municipal water system: a 2000 boil-water advisory led to a $6 million upgrade finished in 2002. We did not find a sewer statement we could confirm, so confirm water and sewer for your lot with Ritchot.

Source: Wikipedia, Île-des-Chênes, checked 10 October 2026.

Ritchot is a founding member of the regional wastewater cooperative, with the plant planned north of Niverville. In January 2026 Ritchot’s mayor said he hoped regional plant construction would start in 2026. Treat that as a hope: the RSR page gave no completion date as of 10 October 2026.

Sources: RSR Wastewater Treatment Facility, Ritchot; SteinbachOnline, 5 January 2026.

Lots and land

Oak River Meadow, phase two

Oak River Meadow, at the south end of town, is a main source of new lots: Terracon Development has phase one under construction, and council approved the conditional use and variance for phase two (351 lots) in August 2026. Terracon can now offer lots to builders.

Source: SteinbachOnline, Oak River Meadow phase two, 21 August 2026.

Separately, council approved an adult-living development for up to 316 units east of Main Street and south of PR 405 in November 2025. We did not find published lot prices, and lots are not in the starting price. Have a lot, or want to look at one? Erd can talk it through.

Source for the 316 units: SteinbachOnline, 5 January 2026.

Around town

Living in Île-des-Chênes

Schools, local facts and the drive.

Most facts carry a source link and the date we checked it, and where we saw only a search summary we say so. Drive times are approximate road routes from OpenStreetMap routing (OSRM), without traffic, checked 10 October 2026.

  • Closest to Winnipeg

    About 27 km and 27 minutes to Portage and Main, and about 43 km and 35 minutes to Steinbach, without traffic.

  • French and English schools

    École Île-des-Chênes School (kindergarten to Grade 8) runs a dual track in Seine River School Division. Source: Manitoba French immersion list, last modified August 2020. The French-language division operates École/Collège régional Gabrielle-Roy from kindergarten to Grade 12. Source: Wikipedia, Franco-Manitoban School Division, checked 10 October 2026.

  • Francophone roots

    Quebec settlers arrived in the 1880s. The community has 1,606 people (2021 Census), up 3.9% from 2016. Source: Wikipedia, Île-des-Chênes, checked 10 October 2026.

How it starts

Starting a build in Île-des-Chênes

Ritchot asks for an engineered plan and a staking certificate up front, so the survey and the drawings come before anything else. Erd confirms what your lot needs in your written quote.

How a Beechwood build works

Questions about building in Île-des-Chênes

Straight answers. If yours isn’t here, call.

Where do I apply for a permit for an Île-des-Chênes build?

To the RM of Ritchot’s planning office, at 352 Main Street in St. Adolphe.

Can I commute to Winnipeg from Île-des-Chênes?

It is about 27 km to Portage and Main, around 27 minutes without traffic. Plan for more at rush hour or in bad weather.

Will lots be available through Oak River Meadow?

Terracon can now offer phase two lots to builders. Prices and release timing are the developer’s to confirm.

Is there a French-language or immersion school?

Yes. According to the 2020 provincial list, École Île-des-Chênes School is dual track, and École/Collège régional Gabrielle-Roy is a French-language school from kindergarten to Grade 12.

Nearby

Other towns near Île-des-Chênes

All the towns

  • Niverville

    A larger town, about 42 km from Portage and Main

  • Ste. Anne

    About 48 km from Portage and Main, with a hospital

  • St-Pierre-Jolys

    About 56 km from Portage and Main, with French immersion schools

Where People Still Matter

Talk to Erd about building in Île-des-Chênes.

Tell him about your lot, or the lot you are looking at. You will get a straight answer and a written quote.

204-392-3920
erd@bwhomes482.com Mailing address: Box 126, Kleefeld, MB R0A 0V0

Most facts on this page carry a source link and the date we checked it, and where we saw only a search summary we say so. Figures and plans change, so check them again before you decide.

Call Erd 204-392-3920Enquire