Home / Articles / Who issues your permit

Who issues your building permit in Southeast Manitoba

By Beechwood Homes · 2 November 2026 · 5 min read

Looking through the garage framing into the house at golden hour

The short answer: it depends on the town, and the office is not always the one you would guess. The RM of Hanover issues permits for Kleefeld, Mitchell, Blumenort and Grunthal. The City of Steinbach and the Town of Niverville issue their own. Île-des-Chênes, St. Malo and La Broquerie go through a rural municipality (RM) office. For St-Pierre-Jolys we found only the RM of De Salaberry’s page, and Ste. Anne has two possible offices.

Who issues the permit, town by town

Contacts and permit pages were checked on 10 October 2026, except the City of Steinbach page, checked on 2 November 2026. Offices change staff and phone numbers, so confirm before you rely on one.

Building permit offices in southeast Manitoba
TownWho issues the permitContact and permit page
Kleefeld, Mitchell, Blumenort, GrunthalRM of Hanover (contact: Development Officer)204-346-7125, permits@hanovermb.ca. Residential building permits.
SteinbachCity of SteinbachThrough the Cloudpermit online system. City Hall is at 225 Reimer Avenue. Building permits and resources.
NivervilleTown of Niverville (the Town’s page says Part 3 permits are issued by the RM of Hanover)329 Bronstone Drive, 204-388-4600, permits@whereyoubelong.ca. Building permits.
Île-des-ChênesRM of Ritchot352 Main Street, St. Adolphe, 204-883-2293, planning@ritchot.com. Building permit; planning and development.
St-Pierre-Jolys, St. MaloRM of De Salaberry (for St-Pierre-Jolys, the page we found; we could not confirm whether the Village also issues permits)466 Sabourin Street, St-Pierre-Jolys, planner 204-433-7406. Permits, forms and licences.
La BroquerieRM of La Broquerie123 Simard Street, 204-424-5251, planningclerk@rmlabroquerie.ca. By appointment, Monday to Friday, 9:00 to 3:30. Building permits.
Ste. AnneTown of Ste. Anne or RM of Ste. AnneDepends on whether the lot is inside the Town. Town office: 14 Centrale Avenue, 204-422-5293. Town planning page.

Ste. Anne is the one to double-check. The Town of Ste. Anne is separate from the RM of Ste. Anne, so confirm per address.

What each office asks for

  • RM of Hanover. A permit is needed for a new home, an addition, basement finishing and any accessory building over 120 square feet (about 11 m²). Permit fees are set by the square foot in Schedule C of Hanover’s fees by-law. In urban areas a permanent foundation needs a surveyor’s construction layout, so ask Hanover whether your lot counts as an urban area. A geotechnical report may be needed if the basement is deeper than four feet (about 1.2 m). Buying in Kleefeld? Our Kleefeld article covers the lagoon limit on new lots. Source: RM of Hanover, residential building permits, checked 10 October 2026.
  • City of Steinbach. Applications go through the Cloudpermit online system, and the City works to Building By-Law 2105. A residential permit deposit policy also exists, so ask about it early. Source: City of Steinbach, building permits and resources, checked 2 November 2026.
  • Town of Niverville. A new dwelling needs a site plan and engineer-stamped plans, and rafter plans have been required since 1 August 2025. A permit expires if work has not started within 12 months. New permits carry a security deposit, forfeited if construction and inspections are not finished by 31 October of the year on the form. The Town’s page lists two one-year extensions at $500. We could not tell whether that is per extension or in total, so ask the Town. Source: Town of Niverville, building permits, checked 10 October 2026.
  • RM of Ritchot. A surveyed site plan and staking certificate, plus one stamped engineered plan. A driveway permit costs $150, and inspections for water and sewer connections are added to the permit fee. Well and septic field permits come through Manitoba Environment (204-945-5305). Ritchot changed its fees on 18 December 2024, so check current rates. Source: RM of Ritchot, building permit and planning and development, checked 10 October 2026.
  • RM of De Salaberry. A development permit and a building permit, plus driveway and occupancy permits. Source: RM of De Salaberry, permits, forms and licences, checked 10 October 2026.
  • RM of La Broquerie. New houses need a permit, and so do accessory buildings over 150 square feet (about 14 m²). Engineer-stamped plans may be required, and an onsite wastewater management permit from the province may be needed as well. An after-the-fact permit costs double. Source: RM of La Broquerie, building permits, checked 10 October 2026.
  • Ste. Anne. We did not find permit requirements on the Town’s planning page (checked 10 October 2026), so ask the office that covers your lot.

What to do first

  1. Confirm the office for your address. Contact the office in the table (for Steinbach, use the permits page), especially for St-Pierre-Jolys and Ste. Anne.
  2. Ask what a new-home application needs on your lot. Whether your lot triggers a survey layout, a geotechnical report or engineered plans is for the office to say.
  3. Ask for the current fee schedule. The amounts are theirs to confirm.
  4. Ask about servicing at the same time. Town water and sewer, or a well and septic system, change what the application involves. See well and septic or town services.
  5. Bring Erd in early. Beechwood is based in Kleefeld and builds custom homes in southeastern Manitoba. Erd answers the phone, and the specifics of your build go in a written quote.

Sources

Not sure which office covers your lot?

Call Erd and tell him where you want to build. The specifics go in a written quote.

Send Erd a note Call Erd 204-392-3920