Home / Articles / Well and septic or town services

Well and septic or town services in Southeast Manitoba: what to check before you buy a lot

By Beechwood Homes · 2 November 2026 · 5 min read

Backyard site work behind a dark-sided home, with wooden posts set in the ground, boulders, a skid steer and bare graded soil among trees

The short answer: in every town in this guide we found a municipal sewer system of some kind, though some of the evidence is old (St. Malo’s dates from 2001). Town water is a different story. Some towns have it, for Blumenort and Mitchell the sources only imply an answer, and for three towns we found no statement. A lot outside the serviced area can mean its own well and septic system.

What to check before you buy a lot

  • Water and sewer. Ask the municipality, not only the seller. Does the lot connect to municipal water, sewer, both or neither? What does connecting cost?
  • Lagoon room. A lagoon is where a town treats its sewage. In several towns below it is at or near capacity, which can pause new lots.
  • Well and septic. Without town service, who approves the well and septic field? Ritchot’s permit page says those permits come through Manitoba Environment (204-945-5305). La Broquerie’s permit page says a province-issued onsite wastewater permit may be needed.
  • The quote. A connection fee, well or septic field may not be part of a build price, so ask what any quote includes.

Town by town: water and sewer

We looked at these sources on 10 October 2026. “Summary only” means we saw only a search summary of the page. “Inferred” means we read it from related facts, not a direct statement. “Not stated” means the source does not say. “Not found” means we found no statement.

Water and sewer by town
TownWaterSewerNote and source
KleefeldYesYes, lagoon at capacityHanover describes a holding pattern on adding lots. Hanover utilities; SteinbachOnline, 20 July 2026.
BlumenortNot stated (we infer none)YesWater is our inference, explained below. Hanover utilities; Hanover homepage.
MitchellNot stated (we infer none)Yes; lagoon almost at capacity about a year ago (summary only)Water as for Blumenort. Hanover’s planning manager said so, naming Grunthal and New Bothwell too. SteinbachOnline, about a year old.
GrunthalYesYes, forcemain to the lagoon at its limit in 2022Hanover said so in 2022. Hanover utilities; SteinbachOnline, 29 March 2022.
SteinbachYes (summary only)Yes, capacity to about 2032 (summary only)Reports say a new wastewater plant is needed. The water entry has no source link of its own. SteinbachOnline, 2026; SteinbachOnline, 2026.
NivervilleYes (summary only)Yes, capacity is a concernIn February 2026 the mayor said a community approaching wastewater capacity finds it hard to issue permits or assure developers there is room. We have no Niverville figure. Niverville utilities; SteinbachOnline, 17 February 2026.
Île-des-ChênesYes, inferredYes, inferredWe infer this from Ritchot’s permit page, which lists water and sewer connection inspections. We found no Ritchot statement about the town itself. RM of Ritchot permit page.
St-Pierre-JolysNot foundYes, lagoon expanded in 2017The mayor then estimated room for about 150 homes. We found no current figure. SteinbachOnline, 8 June 2017.
St. MaloYes (2001 review, summary only)Yes (2001 review, summary only)A 2001 provincial review mentions a municipal lagoon and water treatment plant. We found no current statement. 2001 provincial review.
La BroquerieNot foundYes (a local urban district sewer); lagoon cannot be expandedCouncil voted 4 to 3 on 14 November 2024 to join the regional plant. SteinbachOnline, report of the 14 November 2024 vote.
Ste. Anne (Town)Not foundYes, lagoon expansion reported in 2024In April 2024 the Town expected the work to finish in fall 2024, so ask the Town whether it did. SteinbachOnline, 11 April 2024.

Blumenort and Mitchell water: our inference

Hanover’s utility page lists sewer services in all communities and water services in Kleefeld and Grunthal. Its homepage calendar on 10 October 2026 listed an annual sewer charge only for Blumenort, Mitchell and New Bothwell (that entry may since have been removed). We read this as no municipal water in Blumenort or Mitchell, but that is our inference, not a Hanover statement. Ask Hanover on 204-346-7125 about your lot.

The lagoon limit in Kleefeld, and the regional plant

In March 2022 Hanover said Kleefeld had reached lagoon capacity and needed an expansion (SteinbachOnline, 29 March 2022); we could not find out whether it was built. In July 2026 Hanover’s planning manager described a holding pattern on adding lots until the regional wastewater plant is online (SteinbachOnline, 20 July 2026). Hanover still issued 34 residential permits in Kleefeld in 2025 (SteinbachOnline, 16 January 2026), but we do not know which lots those were on, so ask Hanover about the specific lot. More in our Kleefeld lots article.

The regional plant belongs to the RSR Wastewater Cooperative: Hanover, Ritchot, Taché, Niverville, De Salaberry and La Broquerie. The contract went to AECON at about $205 million, reported in February 2026. As of 10 October 2026 we found no published completion date. Steinbach is not on that list. RSR Wastewater Treatment Facility, Ritchot, checked 10 October 2026.

A good first step

Pick the lot, then phone the municipality that covers it. See also who issues your building permit. Beechwood is based in Kleefeld and builds custom homes in southeastern Manitoba. Call Erd and tell him where the lot is: he answers the phone, and the specifics for your build go in a written quote.

Sources

Looking at a lot and not sure what it connects to?

Call Erd and tell him where it is. He answers the phone, and the specifics go in a written quote.

Send Erd a note Call Erd 204-392-3920